Industrial plant serving a steam generator with double condenser
VERRONE (BI)
Design Realization Pose
N° 1 SJ235 flue support structure to be bolted on site
N° 1 high performance chimney (H1 5,000 pascal – W Condensation) DN500
In this case the challenge was the design and construction of a structure that could be installed with the generator positioned and which did not interfere with the pipes of the existing system.